Complete balance of plant for a Large Hydro including the turn-key supply of small hydroelectric power plant (1MW Francis) installed on the discharge.
Business area:
Hydropower
Activities:
Engineering & Construction
Power KW:
80.000
Area:
LATAM
Country:
Honduras
Principal Characteristics:
Large Hydro Power Plant equipped with 2×30700 kW Francis Turbines
Type of contract:
Balance of Plant Contractor