Complete electrical balance of plant for a cascade hydro power plant and a step-up High Voltage substation.
Business area:
Hydropower
Activities:
Engineering & Construction
Power KW:
30.000
Area:
EUROPE
Country:
Albania
Principal Characteristics:
Small Hydro cascade hydro power with 5 plants equipped with 3×3.677 / 2×2.499 / 2×2.402 kW Francis and 2×2.902 / 2×1.448 Pelton turbines.
Type of contract:
Balance of Plant Contractor