New contract for a small hydro power plant has been signed

New VLH turbine (vlh-turbine.com) to produce energy from a river in northern Italy. STE Energy has just signed a new contract for the construction of a new hydropower plant with a VLH turbine of over 300kW. The plant will be commissioned by the end of this year.
The VLH will be equipped with the innovative power channel sediment trap system, installed on the bottom of the machine. VLH: always one step ahead!

#steenergy #smallhydro #vlhturbine #renewables #innovation