Full EPC contract for step-up and interconnection HV substations and HV overhead transmission line for the biggest solar plant in Chile – 220 kV.
Business area:
High Voltage Systems
Activities:
Engineering & Construction
Voltage:
220 kV
Area:
LATAM
Country:
Chile
Principal Characteristics:
Air Insulated Substations and overhead transmission line – 220 kV – step-up and interconnection substations
Type of contract:
EPC Contractor