Cantayus

Complete water-to-wire and HV electrical substation of a Small Hydro power plant equipped with 2×2,25 MW Francis Turbines.

  • Business area:

    Hydropower

  • Activities:

    Engineering & Construction

  • Power KW:

    4.500

  • Area:

    LATAM

  • Country:

    Colombia

  • Principal Characteristics:

    Small Hydro power plant equipped with 2×2,25 MW Francis Turbines

  • Type of contract:

    Water-to-wire Contractor

  • Join our mailing list!

    Register to receive e-mail updates on new projects carried out,
    participation in fairs and much more on the topics of renewable energy and electricity infrastructure.

    come to meet us